Tagged: tar sands oil

Pages

Energy
12:27 pm
Wed May 8, 2013

Citing public pressure, U.S. State Department extends comment period on Enbridge pipeline proposal

Credit Enbridge Energy
Enbridge's map of it's pipeline systems. Line 67 is part of the Lakehead System.

The U.S. State Department has extended the public comment period on a proposal to nearly double the amount of crude oil that's shipped in a pipeline along Lake Superior.

Enbridge Energy’s Line 67, also known as the “Alberta Clipper” pipeline, runs from the tar sands region in Canada down to Wisconsin near Lake Superior. In the US, it's more than 300 miles long and three feet in diameter.

Read more
The Environment Report
9:00 am
Tue November 27, 2012

Enbridge Energy runs public relations campaign around new pipeline; some neighbors unimpressed

Credit Rina Miller / Michigan Radio
Sections of Enbridge's new pipeline ready to be installed.

You can listen to today's Environment Report segment above.

Enbridge Energy has a bit of a bad reputation in Michigan.  In 2010, one of the company’s pipelines burst near Marshall. More than a million gallons of oil have been cleaned up so far from the Kalamazoo River. Last winter there was a small leak near Sterling in the northeast part of the state.

But Enbridge is planning for growth. They’re replacing the pipeline that burst - Line 6B - and they’re building some new sections as well. The company hopes to double the amount of oil they can move from Canada to refineries in Michigan and Ohio (we've previously reported that an Enbridge spokesman said the main product in the new pipeline will be from Alberta's tar sands region. The EPA says the nature of tar sands oil made the Kalamazoo River spill much more difficult to clean up).

Enbridge has been running a public relations campaign to try to improve its image. But some landowners along the pipeline route are not impressed.

Read more

Pages